Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Oct 15, 2007     Elevator pushrods; Control stick - (2.3 hours)       Category: Controls
Marked and drilled the F-840 elevator pushrod and the threaded pushrod ends, and riveted on the ends. I primed the pushrod and painted it light gray.

Finished assembling the mostly pre-made F-839 elevator pushrod by screwing in the appropriate rod ends. Here, I encountered a slight problem: The drawings specify a 30-1/8" distance between the centers of the rod ends. One end of my pushrod allows the rod ends to be screwed in only about 5/8" before apparently "bottoming out." The other end is normal, but the pushrod is still 1/8" too long with both rod ends screwed in as far as they will go. I might have to tap the hole.

Finally, I drilled the 3/16" holes in the aft control stick that take an AN-3 attach bolt. This bolt secures the upper and lower pieces together, and allows the aft stick to be removed if desired.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.